Scheduled power shutdowns on campus this weekend

Property is currently undertaking electrical infrastructure projects to upgrade systems and replace end-of-life equipment.

As part of this, Buildings C7A, C8A, W2.4A and W5A/W5C will be shut down on Saturday 17 September at 2pm for the remainder of the weekend. Power will be restored to resume normal operations before 7am on Monday 19 September.

During the shutdowns, the buildings will be monitored by Campus Security and will not be open for staff or general access.

For questions, email Garvin Lau.

Date:


Share:


Category:


Tags:


Back to homepage

Got a story to share?


Visit our contribute page >>